NICKLIN WAY UPGRADE

CGC provided the temporary works design, bored pier certification, aerial imagery and undertook inspections of the submerged piles using our remote pile inspection camera.

 

The project involved the construction of a new 6 lane concrete bridge built over a canal. Temporary works design included the geotechnical and structural design of a temporary bridge structure for piling access, piling pads, crane platforms and temporary sheet pile designs. 

Geotechnical Investigations | Temporary Works Design | Construction Phase Services | Pile Certification | Aerial Mapping