top of page

BRUCE HIGHWAY - TINANA INTERCHANGE

PROJECTS

The $38 million upgrade of the Tinana Interchange section of the Bruce Highway involved realignment of realignment of the off ramps, additional lanes, the demolition and re-construction of a new overpass bridge. 


CGC provided the detailed design of the 130m abutment reinforced soil structure retaining walls for the construction of a new overpass over the Bruce Highway. The geotechnical design included sliding, bearing and overturning analysis of the retaining walls, global slip analysis and settlement analysis. 


Challenges included a variable backslope profile and the bridge abutment not perpendicular to the wall, requiring the development of detailed geotechnical models.

Geotechnical Interpretation | Detailed Geotechnical Design | Slope Stability

Georgiou

Project Description
Gallery
CGC_Logo_RGB_ForScreen.png

CGC (Civil Geotechnical Consultants) provide geotechnical engineering solutions for transport and civil infrastructure. Our expertise spans geotechnical design, analysis, construction services, site investigations, advisory and aerial mapping.

We are accredited: 

  • ISO 9001 Quality

  • ISO 14001 Environment

  • ISO 45001 Safety

Our Policies are available upon request e: admin@cgc.net.au

info@cgc.net.au
ABN: 956 044 91474

© 2022 by Civil Geotechnical Consultants

bottom of page